Project Involvement
Cobalt Explorer Drillship Project (H.3618)
Design of Radio System not limited to UHF Radio Repeater, NDB, GMDSS, VHF Marine, EPIRB & SART.
Provide remote technical support to service & commissioning engineer at site .

TAKREER CARBON BLACK & DELAYED COKER PROJECT
Design of PABX, LAN & Structured Cabling System
18 weeks overseas attachment to perform Pre-commissioning at CBDC Site in Ruwais, UAE.

SEA BASE PROJECT PHASE 1 - STATIC
Design of PABX System
Onshore & Offshore commissioning of PABX, Hospital Calling Alarm & Entertainment System in SAPURA Yard, Lumut and Lahad Datu.

CPOC JDA BLOCK B-17 AND B1701 DEVELOPMENT PROJECT PHASE-3 DEVELOPMENT
Assistant Lead for Project team.
Design of UHF Trunked Radio Repeater & VOIP System
Onshore commissioning of UHF Trunked Radio Repeater, VOIP, AIS, Point-to-Point & CCTV System in SAPURA Yard.

SAUDI ARAMCO SULFUR RAILCAR LOADING FACILITIES
10 weeks overseas attachment as Project Support in Seoul Korea.  Objective was to finalize technical design.
Involvement in CCTV, UHF TETRA Radio, PAGA & WLAN System.

AL-ZOUR REFINERY PROJECT
Design of Navigational Aids System which includes RADAR, RACON, AIS and VHF AM System.

BP ANGOLA - Greater Plutonio FPSO FBB Upgrade & PSVM FPSO GMDSS
Design of FBB and GMDSS System Upgrade.

Sample sites designed
Office Building
MAXIS Tender site for Menara PERKESO, Jalan Ampang.
MAXIS Tender site for 348 Sentral.

Shopping Complex/Mall
Plaza Merdeka, Kuching.
KK Times Square (Active design using Zinwave).
U-Mobile Tender site for GURNEY PARAGON, Penang.

Hotels
Retrofit to improve coverage inside Pan Pacific KLIA.
Retrofit to improve coverage inside Double Tree by Hilton.

Airport
Design of KLIA 2 Airport.  Design is based on Active Design using Zinwave products which can cater 2G (900/1800), 3G (2100), WiMAX (2300), future LTE (2600) and TETRA (800).

Back to Top